Skip to content
EG Sigma Community

EG Sigma Community

  • GuidesExpand
    • Getting Started
    • Basic Sigma
    • Libraries
    • Settings
    • Autodesk Integration
    • BIM 360
    • Revit
    • PlanSwift
    • Complete your estimate
    • Integration/Apps
    • Insight & Key Figures
    • Other
  • Support
  • Courses
  • EG.DK
EG Sigma Community
EG Sigma Community

Autodesk Integration

8
  • BIM 360: Installation and setting up the integration
  • Adds and Cuts – Adding Absolute or Percent Values
  • Adding costs to the model estimate
  • Importing the sample model into Sigma
  • Connecting Sigma to the Revit sample model
  • Save and open your estimate from BIM360 Docs
  • Connecting Sigma to the sample model
  • Installing Sigma Autodesk Integrations for Revit and BIM360

Basic Sigma

17
  • Activating Your Sigma License
  • Adjusting the Sales Price
  • Creating a New Estimate in Sigma
  • Recover an Earlier Version of a Sigma Estimate
  • Setting Automatic Markup: Profit
  • Setting Automatic Markup: Overhead
  • Adding Resources
  • Creating your Work Breakdown Structure
  • Start a New Estimate from a Template
  • Printing Reports
  • Checking Cost Prices
  • Adjust the sales price with supplements/deductions
  • Add your Company Logo to your reports
  • Setting Automatic Markup
  • Import CSV or Paste from Excel
  • Categories Explained
  • Add and remove a bookmark

BIM 360

3
  • Adding costs to the model estimate
  • Save and open your estimate from BIM360 Docs
  • Connecting Sigma to the sample model

Complete your estimate

4
  • Adjusting the Sales Price
  • Printing Reports
  • Checking Cost Prices
  • Adds and Cuts – Adding Absolute or Percent Values

Getting Started

3
  • Architect: Getting started
  • Subcontrator: Getting started
  • Contractor: Getting started

Insight & Key Figures

2
  • Adding Key Figures to the Banner
  • Key Figures

Integration/Apps

8
  • Installing the Planswift Integration
  • Editing Your Planswift Take Off
  • Creating a New Estimate with Planswift
  • Connect Settings, Revit
  • Importing an Entire Planswift Take Off
  • Bluebeam – Exporting to Sigma
  • Sigma Procore Integration
  • Sigma Excel Tender List Designer

Libraries

8
  • Importing a Pricelist (CSV File)
  • Making a New Library and Adding Items
  • Editing your Library
  • Reusing an Assembly
  • Updating from a Library or Price List
  • RS Means Guide
  • Installing RSMeans
  • Using RSMeans in Your Estimate

Other

6
  • What to do if Your Files are not Opening in Sigma
  • Run Sigma on Mac computer
  • Renew study license & update installation
  • Troubleshooting connection errors
  • Can’t activate library/addin – shows XML error
  • Sigma Educational package / Sigma Studie-pakke

PlanSwift

4
  • Installing the Planswift Integration
  • Editing Your Planswift Take Off
  • Creating a New Estimate with Planswift
  • Importing an Entire Planswift Take Off

Revit

3
  • Adding costs to the model estimate
  • Importing the sample model into Sigma
  • Connecting Sigma to the Revit sample model

Settings

12
  • Adding and Changing a Category
  • Add New Categories and Units “on the fly”
  • Deleting a Category
  • Find the license number for Sigma
  • See Which Version of Sigma You Have
  • Changing the Path for your Sigma Folders
  • Moving your Sigma License to Another Computer
  • Create an Estimate Template
  • Making more Columns Visible in an Estimate
  • Changing and Deleting a License Number
  • Exploring the Settings Window
  • Categories Explained

Release Notes

16
  • Release Notes 6.0
  • Release Notes 6.5
  • Release notes Sigma 7.0
  • Release notes Sigma Autodesk Integration 3.0 App
  • Release notes 7.1.2
  • Release notes 7.1.3
  • Sigma Excel Cost Library Tool 1.0.2
  • Release notes Sigma Autodesk Integration 3.1 App
  • Release notes 8.0.0
  • Release noter 8.0.0
  • Release notes 8.1.0
  • Release notes – EG MesterData Maler 1.9
  • Release Notes
  • Release notes 8.3.1-8.3.2
  • Release notes – EG Sigma LCA 2.0
  • Release notes – EG MesterData Maler 2.0
View Categories
  • Home
  • Docs
  • Basic Sigma
  • Adding Resources

Adding Resources

2 min read

Resources Defined #

Resources in Sigma are items that have been categorized as Labor, Materials, Equipment, etc. While most estimating software only allows you to use the standard, built in categories, in Sigma you can have as many custom categories as you need. This allows you, for instance, to have multiple Materials categories, which is important because Sigma uses categories to markup the estimate for profit and overhead. And if you get a bigger discount from one supplier than the next, you can mark them separately and not leave any money on the table.

Adding Resources to your estimate #

After building your WBS and getting to the level where you are adding the quantity takeoff, it’s time to add the resources to your takeoff items that will determine the cost PER TAKEOFF UNIT of your takeoff items. For instance, in the picture below, there is a subheading for Gyp board assemblies, and under that subheading there are the takeoff items.

Notice that the unit costs for these takeofff items is in green: that means the cost is made up from the resources in the next level down. If I click on one of the takeoff items in the WBS, I can see the resource components that drive that unit cost.

Several things to keep in mind: #

Resource Categories should always be set at the level where the Unit cost is set.

If you enter the quantity and the unit cost, Sigma will calculate the total cost. If you enter the quantity and the total cost, Sigma will calculate the unit cost.

To see a summary of the resources for a heading, click on that heading and then click on the Resources tab, which is grouped by Category.

The Resource tab shows a summary total of the components in your estimate. To see each instance that is driving the total of a component, click on View all details in the toolbar.

The number of Categories that can be used in Sigma is unlimited. You are not constrained to the usual Labor, Material, Equipment.

Updated on April 27, 2017

What are your Feelings

  • Happy
  • Normal
  • Sad

Share This Article :

  • Facebook
  • X
  • LinkedIn
  • Pinterest
Setting Automatic Markup: OverheadCreating your Work Breakdown Structure
Table of Contents
  • Resources Defined
  • Adding Resources to your estimate
  • Several things to keep in mind:

© 2026 EG Sigma Community

  • Guides
    • Getting Started
    • Basic Sigma
    • Libraries
    • Settings
    • Autodesk Integration
    • BIM 360
    • Revit
    • PlanSwift
    • Complete your estimate
    • Integration/Apps
    • Insight & Key Figures
    • Other
  • Support
  • Courses
  • EG.DK