Skip to content
EG Sigma Community

EG Sigma Community

  • GuidesExpand
    • Getting Started
    • Basic Sigma
    • Libraries
    • Settings
    • Autodesk Integration
    • BIM 360
    • Revit
    • PlanSwift
    • Complete your estimate
    • Integration/Apps
    • Insight & Key Figures
    • Other
  • Support
  • Courses
  • EG.DK
EG Sigma Community
EG Sigma Community

Autodesk Integration

8
  • BIM 360: Installation and setting up the integration
  • Adds and Cuts – Adding Absolute or Percent Values
  • Adding costs to the model estimate
  • Importing the sample model into Sigma
  • Connecting Sigma to the Revit sample model
  • Save and open your estimate from BIM360 Docs
  • Connecting Sigma to the sample model
  • Installing Sigma Autodesk Integrations for Revit and BIM360

Basic Sigma

17
  • Activating Your Sigma License
  • Adjusting the Sales Price
  • Creating a New Estimate in Sigma
  • Recover an Earlier Version of a Sigma Estimate
  • Setting Automatic Markup: Profit
  • Setting Automatic Markup: Overhead
  • Adding Resources
  • Creating your Work Breakdown Structure
  • Start a New Estimate from a Template
  • Printing Reports
  • Checking Cost Prices
  • Adjust the sales price with supplements/deductions
  • Add your Company Logo to your reports
  • Setting Automatic Markup
  • Import CSV or Paste from Excel
  • Categories Explained
  • Add and remove a bookmark

BIM 360

3
  • Adding costs to the model estimate
  • Save and open your estimate from BIM360 Docs
  • Connecting Sigma to the sample model

Complete your estimate

4
  • Adjusting the Sales Price
  • Printing Reports
  • Checking Cost Prices
  • Adds and Cuts – Adding Absolute or Percent Values

Getting Started

3
  • Architect: Getting started
  • Subcontrator: Getting started
  • Contractor: Getting started

Insight & Key Figures

2
  • Adding Key Figures to the Banner
  • Key Figures

Integration/Apps

8
  • Installing the Planswift Integration
  • Editing Your Planswift Take Off
  • Creating a New Estimate with Planswift
  • Connect Settings, Revit
  • Importing an Entire Planswift Take Off
  • Bluebeam – Exporting to Sigma
  • Sigma Procore Integration
  • Sigma Excel Tender List Designer

Libraries

8
  • Importing a Pricelist (CSV File)
  • Making a New Library and Adding Items
  • Editing your Library
  • Reusing an Assembly
  • Updating from a Library or Price List
  • RS Means Guide
  • Installing RSMeans
  • Using RSMeans in Your Estimate

Other

6
  • What to do if Your Files are not Opening in Sigma
  • Run Sigma on Mac computer
  • Renew study license & update installation
  • Troubleshooting connection errors
  • Can’t activate library/addin – shows XML error
  • Sigma Educational package / Sigma Studie-pakke

PlanSwift

4
  • Installing the Planswift Integration
  • Editing Your Planswift Take Off
  • Creating a New Estimate with Planswift
  • Importing an Entire Planswift Take Off

Revit

3
  • Adding costs to the model estimate
  • Importing the sample model into Sigma
  • Connecting Sigma to the Revit sample model

Settings

12
  • Adding and Changing a Category
  • Add New Categories and Units “on the fly”
  • Deleting a Category
  • Find the license number for Sigma
  • See Which Version of Sigma You Have
  • Changing the Path for your Sigma Folders
  • Moving your Sigma License to Another Computer
  • Create an Estimate Template
  • Making more Columns Visible in an Estimate
  • Changing and Deleting a License Number
  • Exploring the Settings Window
  • Categories Explained

Release Notes

16
  • Release Notes 6.0
  • Release Notes 6.5
  • Release notes Sigma 7.0
  • Release notes Sigma Autodesk Integration 3.0 App
  • Release notes 7.1.2
  • Release notes 7.1.3
  • Sigma Excel Cost Library Tool 1.0.2
  • Release notes Sigma Autodesk Integration 3.1 App
  • Release notes 8.0.0
  • Release noter 8.0.0
  • Release notes 8.1.0
  • Release notes – EG MesterData Maler 1.9
  • Release Notes
  • Release notes 8.3.1-8.3.2
  • Release notes – EG Sigma LCA 2.0
  • Release notes – EG MesterData Maler 2.0
View Categories
  • Home
  • Docs
  • Basic Sigma
  • Categories Explained

Categories Explained

1 min read

Categories are used in Sigma for various functions: for reporting on materials needed, or hours required; for adding overhead; for establishing profit; for automatic redistribution of costs; and for organizing Insight views.

Categories (like unit names and production unit names) are stored as *.dat files the Data folder and can be edited by going to File, Settings, Lists. Ctrl + I will open the settings window as well.

Unlike many estimating programs, Sigma does not limit you to the typical categories of Labor, Material, Equipment, Subcontractors. Sigma let’s you have as many categories as you need to organize your estimate the way you want it. Here’s a pretty basic example of why this matters: suppose you have a supplier that gives you a good discount – a better discount than he gives anyone else. You could lump the costs from this vendor in with all the other Materials and mark them up competitively, but you would be leaving money on the table. Namely, the amount of the additional discount he gives you. In Sigma, simply create a new category – MaterialFromJoe for example – and mark it up separately from the other materials.

Managing Categories #

With an estimate open, press Ctrl+I to open the Settings dialogue box.

Click on Lists in the left-side toolbar and then, under System Lookup Lists, choose Categories and press Edit.

Choose the Values tab.

Click on Add, type in the name of the new category, and click OK.

Close the Settings window.

TIP: to remove a category, choose Remove instead of Add. Deleting a category from the list does not delete it from any saved estimates in which it was used.

To turn on automatic addition of new categories (add categories “on the fly” in your estimate): #

Click on the Values tab, as described above.

Mark the checkbox Add unlisted values to the list under Options.

TIP: If you also mark the checkbox Prompt before adding unlisted value, you will be prompted to add the category.

Click OK.

Click OK again.

To change a category already in use in your estimate: #

In the Resources tab in the Estimate window, click on the line item whose category you want to change.

Click on the drop-down arrow under the Change category button in the Quick Access Toolbar and choose the new value for category.

Or right click on the line you want to change and choose a new value for category.

Updated on July 3, 2020

What are your Feelings

  • Happy
  • Normal
  • Sad

Share This Article :

  • Facebook
  • X
  • LinkedIn
  • Pinterest
Import CSV or Paste from ExcelAdd and remove a bookmark
Table of Contents
  • Managing Categories
  • To turn on automatic addition of new categories (add categories “on the fly” in your estimate):
  • To change a category already in use in your estimate:

© 2026 EG Sigma Community

  • Guides
    • Getting Started
    • Basic Sigma
    • Libraries
    • Settings
    • Autodesk Integration
    • BIM 360
    • Revit
    • PlanSwift
    • Complete your estimate
    • Integration/Apps
    • Insight & Key Figures
    • Other
  • Support
  • Courses
  • EG.DK