Skip to content
EG Sigma Community

EG Sigma Community

  • GuidesExpand
    • Getting Started
    • Basic Sigma
    • Libraries
    • Settings
    • Autodesk Integration
    • BIM 360
    • Revit
    • PlanSwift
    • Complete your estimate
    • Integration/Apps
    • Insight & Key Figures
    • Other
  • Support
  • Courses
  • EG.DK
EG Sigma Community
EG Sigma Community

Autodesk Integration

8
  • BIM 360: Installation and setting up the integration
  • Adds and Cuts – Adding Absolute or Percent Values
  • Adding costs to the model estimate
  • Importing the sample model into Sigma
  • Connecting Sigma to the Revit sample model
  • Save and open your estimate from BIM360 Docs
  • Connecting Sigma to the sample model
  • Installing Sigma Autodesk Integrations for Revit and BIM360

Basic Sigma

17
  • Activating Your Sigma License
  • Adjusting the Sales Price
  • Creating a New Estimate in Sigma
  • Recover an Earlier Version of a Sigma Estimate
  • Setting Automatic Markup: Profit
  • Setting Automatic Markup: Overhead
  • Adding Resources
  • Creating your Work Breakdown Structure
  • Start a New Estimate from a Template
  • Printing Reports
  • Checking Cost Prices
  • Adjust the sales price with supplements/deductions
  • Add your Company Logo to your reports
  • Setting Automatic Markup
  • Import CSV or Paste from Excel
  • Categories Explained
  • Add and remove a bookmark

BIM 360

3
  • Adding costs to the model estimate
  • Save and open your estimate from BIM360 Docs
  • Connecting Sigma to the sample model

Complete your estimate

4
  • Adjusting the Sales Price
  • Printing Reports
  • Checking Cost Prices
  • Adds and Cuts – Adding Absolute or Percent Values

Getting Started

3
  • Architect: Getting started
  • Subcontrator: Getting started
  • Contractor: Getting started

Insight & Key Figures

2
  • Adding Key Figures to the Banner
  • Key Figures

Integration/Apps

8
  • Installing the Planswift Integration
  • Editing Your Planswift Take Off
  • Creating a New Estimate with Planswift
  • Connect Settings, Revit
  • Importing an Entire Planswift Take Off
  • Bluebeam – Exporting to Sigma
  • Sigma Procore Integration
  • Sigma Excel Tender List Designer

Libraries

8
  • Importing a Pricelist (CSV File)
  • Making a New Library and Adding Items
  • Editing your Library
  • Reusing an Assembly
  • Updating from a Library or Price List
  • RS Means Guide
  • Installing RSMeans
  • Using RSMeans in Your Estimate

Other

6
  • What to do if Your Files are not Opening in Sigma
  • Run Sigma on Mac computer
  • Renew study license & update installation
  • Troubleshooting connection errors
  • Can’t activate library/addin – shows XML error
  • Sigma Educational package / Sigma Studie-pakke

PlanSwift

4
  • Installing the Planswift Integration
  • Editing Your Planswift Take Off
  • Creating a New Estimate with Planswift
  • Importing an Entire Planswift Take Off

Revit

3
  • Adding costs to the model estimate
  • Importing the sample model into Sigma
  • Connecting Sigma to the Revit sample model

Settings

12
  • Adding and Changing a Category
  • Add New Categories and Units “on the fly”
  • Deleting a Category
  • Find the license number for Sigma
  • See Which Version of Sigma You Have
  • Changing the Path for your Sigma Folders
  • Moving your Sigma License to Another Computer
  • Create an Estimate Template
  • Making more Columns Visible in an Estimate
  • Changing and Deleting a License Number
  • Exploring the Settings Window
  • Categories Explained

Release Notes

16
  • Release Notes 6.0
  • Release Notes 6.5
  • Release notes Sigma 7.0
  • Release notes Sigma Autodesk Integration 3.0 App
  • Release notes 7.1.2
  • Release notes 7.1.3
  • Sigma Excel Cost Library Tool 1.0.2
  • Release notes Sigma Autodesk Integration 3.1 App
  • Release notes 8.0.0
  • Release noter 8.0.0
  • Release notes 8.1.0
  • Release notes – EG MesterData Maler 1.9
  • Release Notes
  • Release notes 8.3.1-8.3.2
  • Release notes – EG Sigma LCA 2.0
  • Release notes – EG MesterData Maler 2.0
View Categories
  • Home
  • Docs
  • Basic Sigma
  • Checking Cost Prices

Checking Cost Prices

1 min read

This guide will show you how to check costs in Sigma and make adjustments for fluctuating prices. This is easily done in the Resources tab in Sigma.

With an estimate open, click on the Resources tab in the tool bar. Your estimate will be grouped by the categories (labor, materials, equipment, subcontractor, etc) you have assigned in the Content tab when building your estimate. Sigma also allows you to have as many custom categories as you need. Many users have multiple material categories to allow them to vary the markup depending on the discount they may, or may not, get from a certain supplier.

Note that the Resources window is responsive to where you are in your WBS on the left. For instance, if I click on Basic Roof, I see all the resources needed for that work.
If I click on Builtup Roof, I see the resources needed for just the Builtup Roof.This functionality in Sigma let’s you drill down into the estimate to review resources on specific work items, or view resources needed for a particular division of work. To see every line item click on View all details in the ribbon. With this view activated, you can double click on any line and be taken to that component in the estimate in the Content tab.

Also in the Resources tab, you can make adjustments to Price/quantity amount and change the Total cost, or adjust the Total cost and the Price/quantity will be adjusted.

Updated on April 27, 2017

What are your Feelings

  • Happy
  • Normal
  • Sad

Share This Article :

  • Facebook
  • X
  • LinkedIn
  • Pinterest
Printing ReportsAdjust the sales price with supplements/deductions

© 2026 EG Sigma Community

  • Guides
    • Getting Started
    • Basic Sigma
    • Libraries
    • Settings
    • Autodesk Integration
    • BIM 360
    • Revit
    • PlanSwift
    • Complete your estimate
    • Integration/Apps
    • Insight & Key Figures
    • Other
  • Support
  • Courses
  • EG.DK